Abstrak


IMPLEMENTASI PETA DETAIL LAHAN TERTUTUP MENGGUNAKAN METODE PENGUKURAN SISTEM GRID DI SMK NEGERI 2 SURAKARTA


Oleh :
Albertus Rafael Rivalino - K1522004 - Fak. KIP

Penelitian ini bertujuan untuk (1) mengetahui bagaimana cara pembuatan peta detail di SMK Negeri 2 Surakarta menggunakan metode pengukuran sistem grid; (2) mengetahui hasil kelayakan peta detail di SMK Negeri 2 Surakarta menggunakan sistem grid. Pelaksanaan proyek menggunakan pendekatan teknik survei menggunakan alat total station untuk mendapatkan data di lapangan dan dipadukan dengan model pengembangan Planning, Production, and Evalution (PPE) yang dikembangkan oleh Richey dan Klein. Pada tahap Planning meliputi kajian literatur, observasi, dan studi pendahuluan. Tahap Production meliputi pengumpulan data, pengolahan data koordinat, dan penggambaran peta detail menggunakan software Autodesk Civil 3D 2021. Tahap Evaluation dilakukan dengan validasi materi dan produk menggunakan instrumen berbentuk angket, kemudian dianalisis untuk mengetahui tingkat kelayakan produk. Hasil penelitian menunjukkan implementasi sistem grid mampu menghasilkan peta detail yang menggambarkan kondisi permukaan tanah di SMK Negeri 2 Surakarta sesuai dengan hasil pengukuran. Berdasarkan hasil validasi materi diperoleh persentase kelayakan sebesar 95,8% dengan kategori sangat layak dan hasil validasi produk mendapatkan persentase rata-rata sebesar 91,2% dengan kategori sangat layak sehingga produk yang dihasilkan memenuhi kriteria kelayakan sebagai peta detail di SMK Negeri 2 Surakarta.This study aims to (1) determine how a detailed map of SMK Negeri 2 Surakarta can be produced using the grid system measurement method, and (2) determine the feasibility level of the detailed map of SMK Negeri 2 Surakarta produced using the grid system. The project was carried out using a survey engineering approach to obtain field data, combined with the Planning, Production, and Evaluation (PPE) development model developed by Richey and Klein. The survey engineering approach employed one set of Topcon GM 50 Series equipment to obtain field data, while the development model's Planning stage covered literature review, observation, and preliminary study. The Production stage covered data collection, processing of coordinate data, and drawing of the detailed map using Autodesk Civil 3D 2021 software. The Evaluation stage was carried out through material and product validation using a questionnaire instrument, which was then analyzed to determine the product's feasibility level. The results show that implementation of the grid system was able to produce a detailed map depicting the ground surface conditions of SMK Negeri 2 Surakarta in accordance with the measurement results. Based on the material validation, a feasibility percentage of 95.8% was obtained, categorized as highly feasible, while the product validation obtained an average percentage of 91.2%, also categorized as highly feasible. Thus, the resulting product meets the feasibility criteria as a detailed map for SMK Negeri 2 Surakarta.