The Analysis Of Risk Management In Construction Project At Ros-In Hotel Yogyakarta
Penulis Utama
:
Saleh Abduelgader Saleh Ali
NIM / NIP
:
S941302041
×The study took a sample of employees of Rosalia Indah Company. The
sample in this study was 30 employees, with data collection using questionnaires
and interview techniques. Data analysis techniques are used to test the Chi-Square
analysis. In this study, researchers used an easier way is to use a tool SPSS
Windows version.
The conclusion of this study are 1) The factors of risk management in the
Ros-In Hotel construction projects related to Physical, Design Phase and
Construction Phase in this study, researchers used risk management factors on the
risk of low, medium and high. To the value of each factor of risk management is
1-3.66 for a low risk factor, 3.67-6.34 for medium risk factors and high risk factor
6.37-9; 2) In this study three research variables which include Physical, Design
Phase and Construction Phase show a more dominant factor is the risk of medium,
with values between 3.67-6.34; 3) The analysis showed that there is a common
ground of the three areas of work (Manager, Engineer, and Supervisor), based on
the results of analysis using Chi-Square acquired a significance value of each
0.826; 0.758; and 0.412 is greater than 0.05, which indicates that there is a shared
understanding of the three fields to the dominant factor that risk-taking is in the
implementation of construction projects Ros-in-hotel.
×
Penulis Utama
:
Saleh Abduelgader Saleh Ali
Penulis Tambahan
:
-
NIM / NIP
:
S941302041
Tahun
:
2014
Judul
:
The Analysis Of Risk Management In Construction Project At Ros-In Hotel Yogyakarta
Edisi
:
Imprint
:
Surakarta - Pascasarjana - 2014
Program Studi
:
S-2 Teknik Sipil
Kolasi
:
Sumber
:
UNS-Pascasarjana Prodi. Magister Teknik Sipil-S941302041-2014